Offline mode, showing a cached version.
15
ES0024001 UPV Team
Universitat Politècnica de València Alcoy
Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
10/10
Complete
Complete
Passed
1. Inspection Queue Entrance
4 / 4
Passed
2. Driver Checks
14 / 14
Passed
3. Brakes
10 / 10
Passed
4. Driver Safety
21 / 21
Passed
5. Vehicle Dimensions
6 / 6
Passed
6. Mechanical Vehicle Design
20 / 20
Passed
7. Electrical Design
22 / 29
Passed
8. Energy Verification
35 / 35
Passed
9. Telemetry
3 / 3
Passed
10. Final Checks
4 / 4
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Europe and Africa 2025 | Prototype | Internal Combustion Engine (Ethanol) | 11 | 727.15km/l 1710.36mpg us |
| Europe and Africa 2024 | Prototype | Internal Combustion Engine (Ethanol) | - | Passed technical inspection |
| Europe and Africa 2023 | Prototype | Internal Combustion Engine (Ethanol) | - | Passed technical inspection |
| France I 2022 | Prototype | Internal Combustion Engine (Ethanol) | - | Passed technical inspection |