Offline mode, showing a cached version.
India
315
Battery Electric
Prototype

IN0011001 Team Pravega

Government Engineering College Barton Hill

Vehicle photo

Results

Attempt 5

85.2

53.0

km/kWh

mi/kWh

BEST RESULT

1 2 3 4 5

Current Rank

17th / 17

16 101.6 km/kWh 63.2 mi/kWh +19.3%

17 85.2 km/kWh 53.0 mi/kWh

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

11/11
Complete
11/11 inspections passed
Passed

1. Inspection Queue Entry

3 / 3
Passed (one driver)

2. Driver's Control

16 / 23
Passed

3. Vehicle Weight

2 / 2
Passed

4. Brakes

9 / 9
Passed

5. Vehicle Dimensions

6 / 6
Passed (one driver)

6. Seat Belts, Roll bar & Exit

12 / 15
Passed (one driver)

7. Visibility

6 / 8
Passed

8. Mechanical Vehicle Design

19 / 19
Passed

9. Electrical Vehicle Design

20 / 20
Passed

10. Energy Verification

12 / 12
Passed

11. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Asia Pacific and the Middle East 2023 Prototype Battery Electric 19 71.35km/kWh 44.34mi/kWh
Indonesia 2022 Prototype Battery Electric - Passed technical inspection