Offline mode, showing a cached version.
India
312

IN0011001 Pravega

Government Engineering College Barton Hill

Prototype P Battery Electric Battery Electric
Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

12/12
Complete
12/12 inspections passed


Previous participation


Event Vehicle category Energy class Rank Result
Qatar 2026 Prototype P Battery Electric Battery Electric 17 87.69km/kWh 54.49mi/kWh
Asia-Pacific and the Middle East 2024 Prototype P Battery Electric Battery Electric 17 85.22km/kWh 52.95mi/kWh
Asia Pacific and the Middle East 2023 Prototype P Battery Electric Battery Electric 19 71.35km/kWh 44.34mi/kWh