Offline mode, showing a cached version.
United States
328
Battery-Electric
Prototype

US0129004 Falcon Opportunity

Armstrong High School

Vehicle photo

Results

Attempt 1

178.9

111.2

km/kWh

mi/kWh

BEST RESULT

1 2 3 4

Current Rank

15th / 21

14 220.8 km/kWh 137.2 mi/kWh +23.4%

15 178.9 km/kWh 111.2 mi/kWh

16 176.7 km/kWh 109.8 mi/kWh -1.3%

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

10/10
Complete
10/10 inspections passed
Passed

1. Telemetry

1 / 1
Passed

2. Inspection Queue Entry

4 / 4
Passed

3. Driver's Control

15 / 15
Passed

4. Vehicle Dimensions

6 / 6
Passed

5. Brakes

8 / 8
Passed

6. Driver Safety

21 / 21
Passed

7. Mechanical Vehicle Design

20 / 20
Passed

8. Electrical Vehicle Design

22 / 22
Passed

9. Energy Verification

10 / 10
Passed

10. Final Check

4 / 4