US0013002 Sting
Cedarville University
Results
Attempt 2
254.2
157.9
km/kWh
mi/kWh
BEST RESULT
1 2 3 4
Current Rank
14th / 23
13 270.4 km/kWh 168.0 mi/kWh +6.4%
14 254.2 km/kWh 157.9 mi/kWh
15 248.1 km/kWh 154.2 mi/kWh -2.4%
Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
Complete
1. Telemetry
2. Inspection Queue Entry
3. Driver's Control
4. Vehicle Dimensions
5. Brakes
6. Driver Safety
7. Mechanical Vehicle Design
8. Electrical Vehicle Design
9. Energy Verification
10. Final Check
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Americas 2025 | Prototype | Battery Electric | - | Passed technical inspection |
| Americas 2023 | Prototype | Internal Combustion Engine (Gasoline) | 4 | 576.23km/l 1355.37mpg us |