Offline mode, showing a cached version.
337
QA0001001 Gernas EV
Qatar University
Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
7/10
In progress
In progress
Passed
1. Inspection Queue Entry
4 / 4
Passed (one driver)
2. Driver's Control
24 / 25
Passed
3. Vehicle Weight
1 / 1
Passed
4. Vehicle Dimensions
6 / 6
Passed
5. Brakes
8 / 8
Passed (one driver)
6. Driver Safety
23 / 26
Passed
7. Mechanical Vehicle Design
19 / 19
Must pass again
8. Electrical Vehicle Design
20 / 21
Not yet started
9. Energy Verification
0 / 10
Not yet started
10. Final Check
0 / 4
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Asia-Pacific and the Middle East 2025 | Prototype | Battery Electric | 13 | 83.04km/kWh 51.6mi/kWh |
| Asia-Pacific and the Middle East 2024 | Prototype | Battery Electric | 15 | 113.13km/kWh 70.3mi/kWh |
| Asia Pacific and the Middle East 2023 | Prototype | Battery Electric | - | Passed technical inspection |