Offline mode, showing a cached version.
India
318

IN0064001 FOLIUM ECO-DRIVE

College of Engineering Trivandrum

Prototype P Battery-Electric BE
Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

10/10
Complete
10/10 inspections passed


Previous participation


Event Vehicle category Energy class Rank Result
Asia-Pacific and the Middle East 2025 Prototype P Battery Electric Battery Electric - Passed technical inspection