Offline mode, showing a cached version.
India
305
Battery-Electric
Prototype

IN0028001 Team Kaizen India

Pandit Deendayal Energy University

Vehicle photo

Results

Attempt 3

131.5

81.7

km/kWh

mi/kWh

BEST RESULT

1 2 3 4

Current Rank

13th / 19

12 140.1 km/kWh 87.0 mi/kWh +6.5%

13 131.5 km/kWh 81.7 mi/kWh

14 104.8 km/kWh 65.1 mi/kWh -20.3%

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

10/10
Complete
10/10 inspections passed
Passed

1. Inspection Queue Entry

4 / 4
Passed

2. Driver's Control

25 / 25
Passed

3. Vehicle Weight

1 / 1
Passed

4. Vehicle Dimensions

6 / 6
Passed

5. Brakes

8 / 8
Passed

6. Driver Safety

26 / 26
Passed

7. Mechanical Vehicle Design

19 / 19
Passed

8. Electrical Vehicle Design

21 / 21
Passed

9. Energy Verification

10 / 10
Passed

10. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Asia-Pacific and the Middle East 2025 Prototype Battery Electric 5 226.76km/kWh 140.9mi/kWh