Offline mode, showing a cached version.
310
US0018001 Peak Efficiency
Colorado School of Mines

Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
11/11
Complete
Complete
Passed
1. Inspection Queue Entry
9 / 9
Passed
2. Driver's Control
21 / 21
Passed
3. Vehicle Weight
2 / 2
Passed
4. Brakes
11 / 11
Passed
5. Vehicle Dimensions
6 / 6
Passed
6. Seat Belts, Roll bar & Exit
20 / 20
Passed
7. Visibility
8 / 8
Passed
8. Mechanical Vehicle Design
22 / 22
Passed
9. Electrical Vehicle Design
21 / 21
Passed
10. Energy Verification
12 / 12
Passed
11. Final Check
4 / 4
Event | Vehicle category | Energy class | Rank | Result |
---|---|---|---|---|
Americas 2024 | Prototype | Battery Electric | 10 | 227.07km/kWh 141.09mi/kWh |
Americas 2023 | Prototype | Battery Electric | - | Passed technical inspection |