Offline mode, showing a cached version.
Ireland
315
Battery-Electric
Prototype

IE0001001 The Geec

University of Galway

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

0/11
Not yet started
0/11 inspections passed
Not yet started

1. Inspection Queue Entry

0 / 9
Not yet started

2. Driver & Safety Gear

0 / 12
Not yet started

3. Vehicle Weight

0 / 2
Not yet started

4. Brakes

0 / 11
Not yet started

5. Vehicle Dimensions

0 / 6
Not yet started

6. Seat Belts, Roll Bar & Exit

0 / 17
Not yet started

7. Visibility

0 / 6
Not yet started

8. Mechanical Vehicle Design

0 / 22
Not yet started

9. Electrical Vehicle Design

0 / 21
Not yet started

10. Energy Verification

0 / 0
Not yet started

11. Final Check

0 / 0


Previous participation


Event Vehicle category Energy class Rank Result
Europe and Africa 2024 Prototype Battery Electric 18 346.16km/kWh 215.1mi/kWh
Europe and Africa 2023 Prototype Battery Electric 14 298.9km/kWh 185.73mi/kWh