Offline mode, showing a cached version.
Greece
718
Battery-Electric
Urban Concept

GR0002001 PROMETHEUS ECO RACING NTUA

National Technical University of Athens

Vehicle photo

Results

Attempt 4

80.4

50.0

km/kWh

mi/kWh

BEST RESULT

1 2 3 4 5 6

Current Rank

11th / 18

10 101.8 km/kWh 63.2 mi/kWh +26.5%

11 80.4 km/kWh 50.0 mi/kWh

12 67.7 km/kWh 42.1 mi/kWh -15.8%

Technical Inspections

Before they get on track, Urban Concept vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

11/11
Complete
11/11 inspections passed
Passed

1. Inspection Queue Entry

10 / 10
Passed

2. Vehicle Weight

2 / 2
Passed

3. Driver & Safety Gear

19 / 19
Passed

4. Brakes

11 / 11
Passed (one driver)

5. Driver Safety

19 / 24
Passed

6. Vehicle Dimensions

11 / 11
Passed

7. Mechanical Vehicle Design

37 / 37
Passed

8. Electrical Vehicle Design

21 / 21
Passed

9. Energy Verification

13 / 13
Passed

10. Telemetry

8 / 8
Passed

11. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Europe and Africa 2024 Urban Concept Battery Electric - Passed technical inspection
Europe and Africa 2023 Urban Concept Battery Electric 12 41.97km/kWh 26.08mi/kWh