Offline mode, showing a cached version.
Brazil
304
Battery-Electric
Prototype

BR0026002 Milhagem UFMG BE

UFMG

Vehicle photo

Results

Attempt 4

373.7

232.2

km/kWh

mi/kWh

BEST RESULT

1 2 3 4 5 6

Current Rank

1st / 9

1 373.7 km/kWh 232.2 mi/kWh

2 373.2 km/kWh 231.9 mi/kWh -0.1%

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 10 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

10/10
Complete
10/10 inspections passed
Passed

1. Inspection Queue Entry

10 / 10
Passed

2. Vehicle Weight

2 / 2
Passed

3. Driver & Safety Gear

21 / 21
Passed

4. Brakes

11 / 11
Passed

5. Driver Safety

23 / 23
Passed

6. Vehicle Dimensions

6 / 6
Passed

7. Mechanical Vehicle Design

27 / 27
Passed

8. Electrical Vehicle Design

21 / 21
Passed

9. Energy Verification

13 / 13
Passed

10. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Brazil 2024 Prototype Battery Electric 4 305.84km/kWh 190.04mi/kWh
Americas 2024 Prototype Battery Electric 15 188.33km/kWh 117.02mi/kWh
Brazil 2023 Prototype Battery Electric 1 367.37km/kWh 228.28mi/kWh
Americas 2023 Prototype Battery Electric - Passed technical inspection
Brazil 2022 Prototype Battery Electric 1 312.13km/kWh 193.95mi/kWh