Offline mode, showing a cached version.
Malaysia
313
Battery-Electric
Prototype

MY0005001 Hyperion Racing

Monash University Malaysia

Vehicle photo

Results

Attempt 5

183.2

113.9

km/kWh

mi/kWh

BEST RESULT

1 2 3 4 5

Current Rank

9th / 13

8 184.2 km/kWh 114.5 mi/kWh +0.5%

9 183.2 km/kWh 113.8 mi/kWh

10 146.7 km/kWh 91.2 mi/kWh -19.9%

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

11/11
Complete
11/11 inspections passed
Passed

1. Inspection Queue Entry

9 / 9
Passed

2. Driver's Control

21 / 21
Passed

3. Vehicle Weight

2 / 2
Passed

4. Brakes

11 / 11
Passed

5. Vehicle Dimensions

6 / 6
Passed (one driver)

6. Seat Belts, Roll bar & Exit

19 / 20
Passed

7. Visibility

8 / 8
Passed

8. Mechanical Vehicle Design

22 / 22
Passed

9. Electrical Vehicle Design

17 / 17
Passed

10. Energy Verification

12 / 12
Passed

11. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Asia-Pacific and the Middle East 2024 Prototype Battery Electric - Did not pass technical inspection
Asia Pacific and the Middle East 2023 Prototype Battery Electric - Passed technical inspection