Offline mode, showing a cached version.
708
FR0020001 Limooz'E Team
École Nationale Supérieure d'Ingénieurs de Limoges
Urban Concept
UC
Battery Electric
Battery Electric
Results
Attempt 4
98.3
61.1
km/kWh
mi/kWh
Best attempt
Current Rank
8th / 15
7 130.8 km/kWh 81.2 mi/kWh +33.0%8 98.3 km/kWh 61.1 mi/kWh
9 75.8 km/kWh 47.1 mi/kWh -22.9%Technical Inspections
Before they get on track, Urban Concept vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
12/12
Complete
Complete
Passed
1. Inspection Queue Entry
4 / 4
Passed
2. Driver's Control
23 / 23
Passed
3. Vehicle Weight
2 / 2
Passed
4. Brakes
10 / 10
Passed
5. Vehicle Dimensions
11 / 11
Passed
6. Seat Belts, Roll bar & Exit
15 / 15
Passed
7. Visibility
9 / 9
Passed
8. Mechanical Vehicle Design
28 / 28
Passed
9. Electrical Vehicle Design
20 / 20
Passed
10. Energy Verification
12 / 12
Passed
11. Telemetry
8 / 8
Passed
12. Final Check
4 / 4
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Poland 2026 | Urban Concept UC | Battery Electric Battery Electric | 11 | 103.06km/kWh 64.04mi/kWh |
| Europe and Africa 2023 | Urban Concept UC | Battery Electric Battery Electric | 8 | 94.66km/kWh 58.82mi/kWh |
| Netherlands 2022 | Urban Concept UC | Battery Electric Battery Electric | 7 | 107.79km/kWh 66.97mi/kWh |