Offline mode, showing a cached version.
Malaysia
316
Battery Electric
Prototype

MY0005001 Hyperion Racing

Monash University Malaysia

Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 11 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

9/11
In progress
9/11 inspections passed
Passed

1. Inspection Queue Entry

3 / 3
Passed

2. Driver's Control

23 / 23
Passed

3. Vehicle Weight

2 / 2
Passed

4. Brakes

9 / 9
Passed

5. Vehicle Dimensions

6 / 6
Passed (one driver)

6. Seat Belts, Roll bar & Exit

12 / 15
Passed (one driver)

7. Visibility

6 / 8
Must pass again

8. Mechanical Vehicle Design

16 / 19
Passed

9. Electrical Vehicle Design

20 / 20
Passed

10. Energy Verification

12 / 12
Not yet started

11. Final Check

0 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Asia Pacific and the Middle East 2023 Prototype Battery Electric - Passed technical inspection