Offline mode, showing a cached version.
313
BR0026002 ARMAC Milhagem UFMG
Universidade Federal de Minas Gerais

Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
12/12
Complete
Complete
Passed
1. Inspection Queue Entry
3 / 3
Passed
2. Driver's Control
15 / 15
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
6 / 6
Passed
5. Seat Belts & Roll bar
11 / 11
Passed
6. Brakes
9 / 9
Passed
7. Visibility
7 / 7
Passed
8. Exit
1 / 1
Passed
9. Mechanical Vehicle Design
19 / 19
Passed
10. Electrical Vehicle Design
15 / 15
Passed
11. Energy Verification
15 / 15
Passed
12. Final Check
3 / 3
Event | Vehicle category | Energy class | Rank | Result |
---|---|---|---|---|
Brazil 2024 | Prototype | Battery Electric | 4 | 305.84km/kWh 190.04mi/kWh |
Americas 2024 | Prototype | Battery Electric | 15 | 188.33km/kWh 117.02mi/kWh |
Brazil 2023 | Prototype | Battery Electric | 1 | 367.37km/kWh 228.28mi/kWh |
Brazil 2022 | Prototype | Battery Electric | 1 | 312.13km/kWh 193.95mi/kWh |