Offline mode, showing a cached version.
711
NO0001001 Fuel Fighter NTNU
Norwegian University of Science And Technology
Urban Concept
UC
Battery Electric
Battery Electric
Technical Inspections
Before they get on track, Urban Concept vehicles need to pass a series of 13 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
13/13
Complete
Complete
Passed
1. Inspection Queue Entry
4 / 4
Passed
2. Driver's Control
15 / 15
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
10 / 10
Passed
5. Seat Belts & Roll bar
11 / 11
Passed
6. Brakes
10 / 10
Passed
7. Visibility
6 / 6
Passed
8. Exit
1 / 1
Passed
9. Mechanical Vehicle Design
27 / 27
Passed
10. Electrical Vehicle Design
15 / 15
Passed
11. Energy Verification
12 / 12
Passed
12. Telemetry
8 / 8
Passed
13. Final Check
4 / 4
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Poland 2026 | Urban Concept UC | Battery Electric Battery Electric | 10 | 137.21km/kWh 85.26mi/kWh |
| Europe and Africa 2025 | Urban Concept UC | Battery Electric Battery Electric | - | Passed technical inspection |
| Europe and Africa 2024 | Urban Concept UC | Battery Electric Battery Electric | - | Passed technical inspection |
| Netherlands 2022 | Urban Concept UC | Battery Electric Battery Electric | - | Passed technical inspection |