Offline mode, showing a cached version.
Hungary
28
Internal Combustion Engine
Prototype

HU0002002 BME SharkTeam

Budapest University of Technology and Economics

Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

12/12
Complete
12/12 inspections passed
Passed

1. Inspection Queue Entry

1 / 3
Passed

2. Driver's Control

23 / 23
Passed

3. Vehicle Weight

2 / 2
Passed

4. Vehicle Dimensions

6 / 6
Passed

5. Seat Belts & Roll bar

13 / 13
Passed

6. Brakes

9 / 9
Passed

7. Visibility

9 / 9
Passed

8. Exit

2 / 2
Passed

9. Mechanical Vehicle Design

19 / 19
Passed

10. Electrical Vehicle Design

13 / 13
Passed

11. Energy Verification

30 / 30
Passed

12. Final Check

4 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Europe and Africa 2024 Prototype Internal Combustion Engine (Diesel) - Did not pass technical inspection