211
MX0004002 Hydro Dzec
UNAM

Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
8/12
In progress
In progress
Passed
1. Inspection Queue Entry
1 / 3
Passed
2. Driver's Control
15 / 15
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
6 / 6
Passed
5. Seat Belts & Roll bar
11 / 11
Not yet started
6. Brakes
0 / 9
Passed
7. Visibility
7 / 7
Passed
8. Exit
1 / 1
Passed
9. Mechanical Vehicle Design
19 / 19
Not yet started
10. Electrical Vehicle Design
0 / 19
Not yet started
11. Energy Verification
0 / 17
Not yet started
12. Final Check
0 / 4
Event | Vehicle category | Energy class | Rank | Result |
---|---|---|---|---|
Brazil 2024 | Prototype | Battery Electric | - | Passed technical inspection |
Americas 2023 | Urban Concept | Battery Electric | - | Did not pass technical inspection |