Offline mode, showing a cached version.
Brazil
14
Internal Combustion Engine
Prototype

BR0039001 Relampinhão UTFPR

UTFPR Curitiba

Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

6/12
In progress
6/12 inspections passed
Passed

1. Inspection Queue Entry

1 / 1
Passed

2. Driver's Control

23 / 23
Passed

3. Vehicle Weight

2 / 2
Passed

4. Vehicle Dimensions

6 / 6
Must pass again

5. Seat Belts & Roll bar

9 / 13
Must pass again

6. Brakes

8 / 9
Must pass again

7. Visibility

8 / 9
Passed (one driver)

8. Exit

1 / 2
Passed

9. Mechanical Vehicle Design

19 / 19
Must pass again

10. Electrical Vehicle Design

7 / 9
Must pass again

11. Energy Verification

23 / 30
Not yet started

12. Final Check

0 / 4


Previous participation


Event Vehicle category Energy class Rank Result
Brazil 2024 Prototype Internal Combustion Engine (Gasoline) - Passed technical inspection
Brazil 2022 Prototype Internal Combustion Engine (Ethanol) - Did not pass technical inspection