Offline mode, showing a cached version.
311
BR0001001 e-Wolf Racing
CEFET RJ

Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
4/12
In progress
In progress
Must pass again
1. Inspection Queue Entry
2 / 3
Passed
2. Driver's Control
23 / 23
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
6 / 6
Passed (one driver)
5. Seat Belts & Roll bar
11 / 13
Must pass again
6. Brakes
8 / 9
Not yet started
7. Visibility
0 / 9
Not yet started
8. Exit
0 / 2
Must pass again
9. Mechanical Vehicle Design
18 / 19
Not yet started
10. Electrical Vehicle Design
0 / 15
Not yet started
11. Energy Verification
0 / 15
Not yet started
12. Final Check
0 / 4
Event | Vehicle category | Energy class | Rank | Result |
---|---|---|---|---|
Brazil 2024 | Prototype | Battery Electric | - | Passed technical inspection |
Brazil 2022 | Prototype | Battery Electric | - | Did not pass technical inspection |