Offline mode, showing a cached version.
Qatar
315

QA0001001 GERNAS-E

Qatar University

Prototype P Battery Electric Battery Electric
Vehicle photo

Technical Inspections

Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.

12/12
Complete
12/12 inspections passed


Previous participation


Event Vehicle category Energy class Rank Result
Qatar 2026 Prototype P Battery Electric Battery Electric - Did not pass technical inspection
Asia-Pacific and the Middle East 2025 Prototype P Battery Electric Battery Electric 13 83.04km/kWh 51.6mi/kWh
Asia-Pacific and the Middle East 2024 Prototype P Battery Electric Battery Electric 15 113.13km/kWh 70.3mi/kWh