Offline mode, showing a cached version.
318
ID0001002 D'BASE PROTO
BINUS University
Prototype
P
Battery Electric
Battery Electric
Results
Attempt 3
223.5
138.9
km/kWh
mi/kWh
Best attempt
Current Rank
5th / 8
4 294.2 km/kWh 182.8 mi/kWh +31.6%5 223.5 km/kWh 138.9 mi/kWh
6 152.4 km/kWh 94.7 mi/kWh -31.8%Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
12/12
Complete
Complete
Passed
1. Inspection Queue Entry
3 / 3
Passed
2. Driver's Control
23 / 23
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
6 / 6
Passed
5. Seat Belts & Roll bar
13 / 13
Passed
6. Brakes
9 / 9
Passed
7. Visibility
9 / 9
Passed
8. Exit
2 / 2
Passed
9. Mechanical Vehicle Design
19 / 19
Passed
10. Electrical Vehicle Design
15 / 15
Passed
11. Energy Verification
15 / 15
Passed
12. Final Check
3 / 3
| Event | Vehicle category | Energy class | Rank | Result |
|---|---|---|---|---|
| Qatar 2026 | Prototype P | Battery Electric Battery Electric | 6 | 496.45km/kWh 308.48mi/kWh |
| Asia-Pacific and the Middle East 2025 | Prototype P | Battery Electric Battery Electric | 4 | 239.96km/kWh 149.11mi/kWh |
| Asia-Pacific and the Middle East 2024 | Prototype P | Battery Electric Battery Electric | 7 | 324.56km/kWh 201.67mi/kWh |