Offline mode, showing a cached version.
311
BR0001001 eWolf Racing
CEFET RJ

Technical Inspections
Before they get on track, Prototype vehicles need to pass a series of 12 technical inspections. For some, the only goal is getting through this test. Many never even make it that far.
3/12
In progress
In progress
Not yet started
1. Inspection Queue Entry
0 / 3
Passed
2. Driver's Control
23 / 23
Passed
3. Vehicle Weight
2 / 2
Passed
4. Vehicle Dimensions
6 / 6
Must pass again
5. Seat Belts & Roll bar
5 / 13
Not yet started
6. Brakes
0 / 9
Must pass again
7. Visibility
6 / 9
Not yet started
8. Exit
0 / 2
Must pass again
9. Mechanical Vehicle Design
17 / 19
Not yet started
10. Electrical Vehicle Design
0 / 12
Not yet started
11. Energy Verification
0 / 19
Not yet started
12. Final Check
0 / 3
Event | Vehicle category | Energy class | Rank | Result |
---|---|---|---|---|
Brazil 2024 | Prototype | Battery Electric | - | Passed technical inspection |
Brazil 2023 | Prototype | Battery Electric | - | Did not pass technical inspection |